Tool Guide / Project Management
Trello: what it is and how to start
A visual board where tasks are cards that move across columns as work progresses, so the state of a project is visible at a glance.
Who it is for
Small teams and individuals who want shared visibility without learning project management software. Its strength is that a new person understands it in under a minute, which matters more than features for a team that will not be trained.
What it costs
The free plan is $0 and includes unlimited cards, up to 10 boards per workspace, unlimited Power-Ups per board, unlimited activity log, assignees and due dates, mobile apps and two-factor authentication. Its limits are up to 10 collaborators per workspace, 10MB per file attachment, and 250 workspace command runs per month for automation. Standard is $5 per user per month billed annually or $6 monthly, Premium is $10 annually or $12.50 monthly, and Enterprise is $17.50 per user per month billed annually. Paid tiers add unlimited boards, more automation, and calendar, timeline, table and dashboard views.
Quick facts
- Category: Project Management — Boards & Task Tracking
- Pricing model: freemium
- Runs on: Web, Windows, macOS, iOS, Android
- Difficulty for a beginner: beginner
- Official site: https://trello.com
How to get started with Trello
- Start with three columns and resist adding more: To do, doing, done. Almost every elaborate column structure collapses back to roughly this. Add a column only when you repeatedly cannot tell what state something is in.
- Write cards as outcomes, not topics: "Booking form works end to end" can be finished; "website" cannot. A card that cannot be completed will sit in the doing column forever and quietly destroy trust in the board.
- Give every card one assignee and a due date: One name, not several. Cards owned by the whole team are the ones that turn out never to have been started, and a date is what makes something visible when it slips.
- Put the detail on the card, not in chat: Use the description and comments for decisions and context. Anything decided in a chat thread is effectively lost, and the board becomes fiction while the real project lives somewhere unsearchable.
- Watch for a pile-up in one column: The main diagnostic value of a board is visual. A doing column with fifteen cards means the team is starting rather than finishing, which is the most common cause of everything being simultaneously late.
- Archive done cards regularly: A done column with two hundred cards makes the board slow to read. Archive at the end of each week or project; nothing is deleted and the activity log keeps the history.
- Check the free plan limits before scaling up: 10 boards per workspace, 10 collaborators, and 250 automation runs a month. Generous for a small team, and worth knowing before you plan around a board per client.
Should you use this instead of something else?
A spreadsheet shows everything at once and is better when dates and dependencies matter, but is worse at showing state at a glance. Asana and Monday offer more structure, reporting and views, at the cost of setup time and a per-user fee. Notion can be made into a board but requires you to build it. Trello wins on the thing that decides whether a small team actually uses a tool: nobody needs to be taught how it works.
Common beginner mistakes
- Creating a column for every possible state, producing a board too wide to read and impossible to keep current.
- Writing cards as topics rather than finishable outcomes, so nothing ever legitimately moves to done.
- Keeping the real conversation in chat while the board rots into an inaccurate summary.
- Assigning cards to several people, which produces work everyone assumed someone else had picked up.
- Planning a board per client without checking the 10-board free limit, then discovering it mid-setup.
- Never archiving, until the board is slow to load and unpleasant enough to read that people stop opening it.
Last verified: 2026-08-07. Source: https://trello.com/pricing